Case study

Keeping Safety on Track – Bespoke Steel Bar Storage System

Supporting rail infrastructure on a global scale requires precision, reliability and the ability to solve complex logistical challenges. Our client is a rail infrastructure specialist, operating worldwide delivering solutions that support the construction, maintenance, and long-term functioning of rail networks. Their work spans a wide range of rail components, systems, and specialist equipment, all underpinned by their dedicated team.

At a UK facility, the client was faced with challenges related to the storage and handling of long-length steel bars. As production volumes grew and operational demands evolved, the existing storage arrangement no longer met the requirements for safety, accessibility, or efficiency. Recognising the potential risk to both personnel and productivity, the client developed an initial concept for an improved system and engaged WSL to transform it into a practical, safe, and fully bespoke storage solution.

Original storage situation

The Storage and Handling Challenge

Steel bars were delivered and stored in large, bundled quantities which were stored in floor-based stacks. While this approach maximised short-term use floor space utilisation, it also introduced several challenges:

Unsafe access: This was the most critical issue. The length and weight of the bundles meant overhead cranes were needed to handle and transport them, but the bundles being stacked directly on top of one another meant there was no clearance to attach the lifting slings. To attach the slings, operators would often need to climb on top of the bundles and although risk was mitigated using safety equipment and procedures, this method still fell short of the client’s safety expectations.

Restricted movement: During the manual lifting process to attach the crane equipment, exclusion zones had to be established, preventing personnel from entering the area. Any unexpected movement or shift in the load posed a serious hazard, further restricting safe circulation and reducing overall operational flexibility.

Operational inefficiency: Accessing specific bundles involved multiple handling steps, including lifting, repositioning, and temporary relocation of adjacent materials which slowed operations. Extended handling times, combined with the need for exclusion zones, reduced throughput and placed added strain on operators and equipment.  As production volumes increased, these inefficiencies became increasingly disruptive.

In addressing these challenges was a critical structural constraint: the warehouse floor. Due to the age of the building, the floor had limited load-bearing capacity. Any solution that concentrated significant weight within a small footprint posed the risk of further structural degeneration.

The client required a solution that would:

  • Provide safe, secure storage for long-length steel bars
  • Enable easy and controlled access to individual bundles
  • Distribute weight evenly in line with material length, weight, and volume
  • Integrate seamlessly with existing site operations

This combination of requirements made a tailored, engineered solution essential.

The Solution: A Fully Bespoke Steel Bay Racking System

Following an initial site assessment and detailed consultations with the client’s operational team, WSL proposed a bespoke steel bay racking system, designed to address both the handling challenges and the building’s structural limitations.

Rather than tall storage, which would concentrate loads and increase stress on the warehouse floor, the solution focused on distributing the load horizontally. The available floor space allowed for a wider, shallower storage configuration using multiple steel racking bays. This approach would significantly reduce point loading, while improving accessibility and safety.

View of loaded bays

Key Design Features and Engineering Considerations

The final solution comprised of multiple steel bay units, each engineered with the following features:

  • Robust steel bases designed to evenly distribute the load across the floor surface, minimising structural stress.
  • Heavy-duty vertical posts fixed to the base and arranged in a repeating pattern to form continuous channels for long loads, preventing shifting or rolling.
  • Full-length support channels that fully supports steel bars, eliminating overhangs and instability.
  • Seven-bundle capacity with upright posts sized to safely accommodate up to seven bundled layers, while maintaining stability.
  • Support arms providing clear separation between bundle layers, creating safe clearance for crane equipment, preventing direct material contact, and improving access.
  • Improved organisation enabling clearer batch identification, better stock control, and more efficient material handling.

This configuration allows individual bundles to be accessed independently, without disturbing adjacent or overlaying materials, delivering a significant safety improvement in both safety and operational efficiency.

Base and vertical posts assembled

Prototype Development and Design Refinement

As with all bespoke solutions, real-world validation was critical. WSL manufactured a demonstration bay as the first phase of the project which was installed on site to test the design under live conditions.

During this trial, it was established that additional reinforcement would further enhance system stability. Leveraging WSL’s in-house fabrication capabilities, the design was quickly refined. Steel gussets were added beneath each vertical post, strengthening the connection between the post and the base and significantly improving performance under constant load.

The ability to implement design improvements rapidly, without reliance on external suppliers, highlights WSL’s flexibility and strength in in-house manufacturing.

Prototype delivered

In-House Manufacturing and Quality Assurance

All steel bay racking units were manufactured at WSL’s Leeds facility. As a UKCA-certified factory and Approved Manufacturer Full SEMA member, WSL operates to the highest standards of quality, safety and compliance.

Each component was fabricated with precision to ensure consistency across all bays. Following manufacture, the units were finished with a yellow paint coating, to align with the client’s existing structures and maintain visual consistency throughout the site. The finish also enhanced visibility and safety within the warehouse environment.

By designing, manufacturing, and installing the system in-house, WSL eliminated reliance third-party suppliers, ensuring cost efficiency, streamlined communication, and full control over quality and delivery.

Logistics Planning and Safe Delivery

Due to the bespoke dimensions and weight of the steel bay units, transportation required detailed planning. The completed bays were loaded at WSL’s Leeds factory onto HGV trailers, securely restrained, and transported to the clients South Yorkshire facility.

Key logistical considerations included:

  • Controlled loading using forklift trucks
  • Careful load distribution within trailers
  • Secure restraint of oversized components
  • Controlled offloading upon arrival

All units were delivered safely and without incident, ready for installation.

HGV loaded with racks leaving WSL factory

Phased Installation Strategy

To minimise disruption to ongoing operations, installation was completed in two carefully planned phases.

Phase One: Initial Installation and Stock Transfer

  • One half of the warehouse was cleared
  • A five-person team of experienced installers assembled and installed the first set of racking bays.
  • Installation commenced on Monday and was complete by Friday

This allowed the client to transfer steel bar stock over the weekend onto the newly installed racks.

Phase Two: Completion and Full Commissioning

  • With the first area operational, the second half of the warehouse was cleared.
  • The installation team returned on Monday, to install the remaining bays.
  • By Friday that week, the full system was installed and operational

This phased approach ensured continuous operational capability while maintaining safety throughout the installation.

Steel bar racks phase 1 in use

Project Management and Coordination

The project was coordinated and overseen by Project Manager, Gareth Crowley. Based at WSL’s offices alongside the engineering and manufacturing teams, Gareth maintained full visibility of production progress and installation readiness throughout the project.

This close integration enabled:

  • Real-time communication between design, manufacturing, and installation teams
  • Proactive client updates
  • Precise coordination of transport and installation schedules.

Meeting the agreed completion date was particularly critical, as the client’s Senior management team from France had scheduled a site visit shortly after completion. Through careful planning and coordination, the project was delivered on time and to specification.

Loading stock into the completed second phase

Benefits and Operational Impact

The completed steel bay racking system delivered significant operational improvements:

  • Improved safety: Elimination of unstable stacking and reduced manual handling risks.
  • Enhanced accessibility: Individual bundles can be accessed quickly and safely.
  • Optimised floor loading: Even load distribution protects the aging warehouse floor
  • Increased efficiency: Faster retrieval times and improved organisation support smoother daily operations.
  • Seamless integration: The bespoke system fits naturally within existing site infrastructure.

Loaded storage system

A Future-Proof Storage Solution

This project demonstrates how bespoke engineering, combined with in-house manufacturing and proactive project management, can resolve complex storage problems. By fully understanding the client’s constraints and objectives, WSL delivered a future-proof solution that significantly improves safety, efficiency, and long-term operational resilience.

For a global rail infrastructure specialist operating at scale, the new steel bay racking system provides a robust, future-proof storage solution, supporting operational excellence today while enabling continued growth in the years ahead.

Download case study brochure here: Keeping Safety on Track – Bespoke Steel Bar Storage Solution

Need a Solution for a Complex Storage Challenge?

If your operation is limited by space, load capacity, safety requirements, or non-standard materials, WSL can help. We design and deliver fully bespoke storage and handling solutions tailored to your operational, structural, and logistical needs.

From site assessment and concept design to in-house manufacture, delivery, and installation, our integrated approach ensures full control, compliance, and confidence at every stage.

Established in 1989, WSL is UKCA and SEMA accredited, reflecting our commitment to the highest quality and safety standards. We work closely with your team to create a safe, efficient, and future-proof solutions that support long-term performance.

Contact us today to discuss how a tailored storage system could transform your facility. Call 0113 245350 or email sales@wslmail.co.uk

Trusted by all

Just Some Of Our Clients

Get started

Discuss Your Project

Our service is completely client-centric. We provide all manufacturer types, as well as fitters, engineers and inspectors; which means that not only can we deliver your entire project from start to finish, but that we can provide a fully bespoke solution for your individual needs. Get in touch to find out more.